hydro

Rob Burrow Centre for Motor Neurone Disease, Leeds

A collaborative Facade Solution for a Landmark Healthcare Project in Leeds

Rob Burrow Centre for Motor Neurone Disease

A landmark healthcare development for Leeds Teaching Hospitals, the Rob Burrows Centre for Motor Neurone Disease features a fully engineered TECHNAL aluminium facade delivered in collaboration with Kingfisher Windows, Corstorphine & Wright, and I&G. The solution brings high-performance, precision detailing and abundant natural light to a purpose-built facility designed to support world-class MND care, research and therapy.

  • ArchitectCorstorphine & Wright
  • Year2025
  • PhotographerI&G Contractors
  • FabricatorKingfisher Windows

The Rob Burrow Centre for Motor Neurone Disease stands as a pioneering, purpose-built facility designed to support world-class care, research and therapy for people living with MND. Widely recognised as an exceptional achievement for Leeds and its healthcare community, the centre brings together services that were previously dispersed, creating a single, welcoming environment with an emphasis on comfort, dignity and natural light.

Within this context, Kingfisher Windows were appointed to design, supply and install a complete aluminium facade solution, working closely with the project team to ensure the building's architectural ambition and performance requirements could be achieved.

PH_technal_b2b_rob-burrows-1

To meet the design and technical objective, the facade package incorporated:

The project required triple-glazed units, enhanced structural design coordination, and a full shift from the originally specified hybrid timber / aluminium system to a fully aluminium facade. TECHNAL systems were selected for their proven thermal, acoustic and structural performance - essential for a healthcare building with complex user and environmental needs.

PH_technal_uk-ie_rob-burrows-2

A Collaborative, Detail-Driven Design Process

From the earliest stages, Kingfisher worked through a comprehensive design review with Corstorphine & Wright, I&G - Illingworth & Gregory Limited (Main Contractor), and the wider technical team. As the TECHNAL systems were new to Kingfisher's manufacturing line, the programme required significant preparation.

Given that the TECHNAL aluminium facade systems were new to Kingfisher's fabrication department, the company undertook extensive training on:

  • Fabrication techniques

  • Software and ordering processes

  • Design detailing

  • On-site installation best practice

TECHNAL supported the team every step of the way - providing technical assistance, estimating support, system guidance, and both factory-based and on-site training. This partnership ensured that Kingfisher Windows could deliver the facade confidently and to the required standard, despite the complexity and structural demands of the project.

PH_technal_uk-ie_rob-burrows-3

Precision Installation for a Complex Build

The installation involved handling large and heavy glass units, requiring a crane and a specialist fixing team with extensive aluminium facade experience. Their skill and coordination ensured the facade was installed efficiently, safely and in line with the project's quality expectations. The structural complexity of the building meant more input was needed from structural engineers than on a typical facade installation - an area where Kingfisher's technical preparation and detailed approach proved invaluable.

This project has been hugely rewarding for our team—not only because of its importance to the community, but because it pushed us to grow our expertise. With strong technical support from TECHNAL at every stage, we were able to deliver a façade package we’re truly proud of.
Deborah McKenzie

A Project Built on Partnership

PH_technal_uk-ie_rob-burrows-4

The Rob Burrow Centre for MND has been celebrated not only as an architectural achievement, but as a meaningful investment in the lives of patients, families, clinicians and researchers. Its delivery required genuine collaboration across the design, contracting and fabrication teams.

Kingfisher Windows' precision workmanship, supported by TECHNAL's full suite of technical, fabrication and on-site training assistance, ensured a facade that reflects both the engineering demands of the project and the human importance of the building.

Want to see more?

You may also be interested in

Let's Talk About Your Next Project

Have a question, need technical guidance, or want to discuss a specific build? Our team of experts is here to help. Reach out today and discover how TECHNAL can bring added value to your commercial or residential aluminium building project.

Contact us
hydro
We take care of our customers